Templeborough Power Plant – Pumping System Works
Description:
Advantage Pumping Solutions carried out the detailed design and installation works for 5no pumping stations on site to pump all of the surface and foul water around and off site.
Advantage Pumping Solutions supplied 5no GRP pumping station to different requirements including combined valve chambers integrated on the pumping station. This means that the installation is an easier then installing 2 separate units but still maintains the serviceability requirements for the system. The systems were delivered to site all pre-manufactured meaning the installation on site was a lot quick than traditional methods. In addition, the health and safety risks were reduced.
One of the pumping systems was designed with stainless steel pumps, pipework and valves to cope with corrosive effluent from the power plant to pump into the treatment plant.
Scheme Name: Templeborough Power Plant
Client: Interserve Special Projects
Completion Date: October 2018
Contract Period: 125 weeks